CP Groundworks were appointed as the main drainage subcontractor for all non-possession drainage work. The aim of the project was to install a new dive under line which enable a new rail line to be constructed. The aim is to remove constraints to the timetable caused by slower freight trains on the Great North Great Eastern (GNGE) route having to cross over the high-speed East Coast Main Line.
CP Groundworks were tasked with the construction of new balancing ponds, installation of numerous precast headwalls and chambers including oversize diameter precast manhole (exceeding 3m). All trackside filters drain that ran longitudinally either side of the new line and within the dive under sections were installed within challenging groundwater conditions. Approximately 6km of drainage was installed through phase 1 and phase 2.
Challenges were the tight timeframe to deliver the works as well as the very high water table encountered whilst installing the carrier drains and head walls.