CP Groundworks completed multiple projects while at Gatwick Airport spanning an 18-month period. These included major alterations and renewals of 3 taxiways, upgrades to Pier 6 to install a deep 12-way ducting system and large-scale enabling works to the Rapid Exit Taxiway (RET) on the main runway. Throughout our time at Gatwick, the work varied from daytime working to night shifts and block closures.
Appointed as the airside groundworks subcontractor, our scope included concrete bay replacement, new duct pit and ducting installation, fire main protection slabs, earthworks, deep drainage, attenuation and new ‘rapid exit taxiway’ construction to the main runway.
Challenges of the works included delivering to a tight programme across multiple projects and ensuring areas were handed back on time at the end of each shift. We consistently achieved programmes early and there were no delays in handing back to Gatwick Airport.