Appointed as the civils subcontractor supplying plant and labour, CP Groundworks work included excavation for the installation of the new pipeline in urban areas. When finished, this project will replace 90km (56 miles) of the 105km (65 miles) Southampton to London pipeline, starting at Boorley Green inHampshire and ending at the West London Terminal storage facility in Hounslow.
CP Groundworks excavated and installed the temporary works (including trench boxes, sheets and frames) to allow the pipeline to be installed. Once installed the trench was backfilled and compacted to Specification for Highway Works standards.
Challenges of the works included maintaining access to the properties, keeping noise to a minimum and leaving as many traffic routes open as possible.